{"id":2448,"date":"2021-09-23T17:41:14","date_gmt":"2021-09-23T17:41:14","guid":{"rendered":"https:\/\/makello.com\/blog\/?p=2448"},"modified":"2024-04-02T20:07:36","modified_gmt":"2024-04-02T20:07:36","slug":"step-7-small-residential-energy-storage-rebate-is-open","status":"publish","type":"post","link":"https:\/\/makello.com\/blog\/step-7-small-residential-energy-storage-rebate-is-open\/","title":{"rendered":"Step 7 &#8211; Small Residential Energy Storage Rebate Is Open!"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/www.pv-magazine.com\/2021\/09\/23\/residential-battery-inverter-from-the-united-states\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"423\" src=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NV14-yRiJmINA-72-dpi-8-x-6r.jpg\" alt=\"\" class=\"wp-image-2596\" style=\"width:666px;height:487px\" srcset=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NV14-yRiJmINA-72-dpi-8-x-6r.jpg 576w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NV14-yRiJmINA-72-dpi-8-x-6r-300x220.jpg 300w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/a><figcaption class=\"wp-element-caption\"><strong>NeoVolta&#8217;s AC and DC coupled solutions work with existing residential solar systems.<\/strong>   NeoVolta (San Diego, CA) has lithium iron phosphate (LiFePO4) chemistry &#8216;safer by design&#8217;.<br>https:\/\/www.pv-magazine.com\/2021\/09\/23\/residential-battery-inverter-from-the-united-states<\/figcaption><\/figure>\n\n\n\n<p>New Self-Generation Incentive Program (SGIP) Rebate application for <em>Step 7<\/em> &#8211; <em>Small Residential Energy Storage <\/em>funding, becomes available starting Monday, Sept 27, 2021, at a rebate value of $0.15\/wH.<\/p>\n\n\n\n<p class=\"has-background\" style=\"background-color:#a1df95\"><strong>Caller: <\/strong>&#8220;Quick question.  I already have solar, so which Battery is right for me?  I need an answer ASAP, because SGIP Rebates are back and who knows for how long.&#8221;<br><strong>Response: <\/strong>&#8220;If you already have a solar, then NeoVolta battery can work with just about any existing system, and is lowest cost to integrate as an AC Coupled solution, for up to 9.2kW solar.  There are exceptions to the rule, if the existing solar is landing on a  Renewable Meter Adapter (RMA), but we have custom solutions in that case.  And, the NeoVolta battery can be DC coupled to solar as well, up to 8.448kW DC, using Tigo TS4-A-O Power Optimizers.<\/p>\n\n\n\n<p>Californian&#8217;s reaped over $1B in SGIP Rebates.&nbsp; Don&#8217;t miss out!&nbsp;&nbsp;It is possible to qualify for up to 100% incentives for your solar battery in the Equity Resiliency $1\/wH category and up to 85% in the Equity $0.85\/wH category.<\/p>\n\n\n\n<div class=\"wp-block-group has-very-light-gray-background-color has-background\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-luminous-vivid-amber-background-color has-background wp-element-button\" href=\"https:\/\/meet.makello.com\/#\/customer\/san-diego-solar-battery-sgip-rebate-preparation\" target=\"_blank\" rel=\"noreferrer noopener\">Reserve NOW!<\/a><\/div>\n<\/div>\n\n\n\n<ul class=\"wp-block-list\">\n<li>$1,000 to Reserve Solar Battery &amp; SGIP Rebate Preparation by Makello  <br>(Don&#8217;t wait until the SGIP Rebate is gone!)<\/li>\n<\/ul>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<p class=\"has-very-light-gray-background-color has-background\" style=\"font-size:12px\"><em>*Makello, as an authorized distributor for Green Energy EPC (CA Lic 978836), cannot guarantee SGIP acceptance, funds availability, and rebate amount. Only the Center for Sustainable Energy (CSE), the SGIP program administrator, can approve the Rebate Reservation Form application. When the CSE accepts our application on your behalf, you&#8217;ll be approved &#8211; and you&#8217;ll have up to 12 months to decide when to install, or request an extension..<\/em><\/p>\n<\/div><\/div>\n\n\n\n<p>A $1,000 refundable fee reserves your Solar Battery and SGIP Rebate Preparation, which includes the required site survey, Energy Analysis and purchase contract to sign, prior to the SGIP Rebate Reservation Form (RRF) submission.&nbsp; (The refundable fee terms are in the &#8220;Addendum-to-the-Green-Energy-EPC-contract-1&#8221; reference section below.)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"371\" src=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Mike-R-Vista-Enphase-Encharge-interior-installation-20210902_150950-at-72dpi-TEXT.jpg\" alt=\"\" class=\"wp-image-2477\" style=\"width:392px;height:252px\" srcset=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Mike-R-Vista-Enphase-Encharge-interior-installation-20210902_150950-at-72dpi-TEXT.jpg 576w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Mike-R-Vista-Enphase-Encharge-interior-installation-20210902_150950-at-72dpi-TEXT-300x193.jpg 300w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><figcaption class=\"wp-element-caption\"><em>Enphase&#8217;s AC Coupled solutions are eligible for SGIP Rebates. The Encharge&#8217;s lithium iron phosphate (LiFePO4) chemistry is safer by design<\/em> and is 2021 EES Award Winner!  https:\/\/enphase.com\/blog\/encharger-battery-wins-2021-ees-award<\/figcaption><\/figure>\n\n\n\n<p>The SGIP Program may become wait-listed, it may be funded again, and it may run out of funds at any time, so it is critical to proceed quickly to process your SGIP Rebate.*<\/p>\n\n\n\n<p class=\"has-medium-font-size\">Click here to <strong><a href=\"https:\/\/meet.makello.com\/#\/customer\/san-diego-solar-battery-sgip-rebate-preparation\" title=\"Reserve your Solar Battery Deposit &amp; SGIP Rebate Preparation for Makello\u2019s SDG&amp;E Territory\">Reserve Solar Battery &amp; SGIP Rebate Preparation for Makello\u2019s SDG&amp;E Territory<\/a><\/strong><\/p>\n\n\n\n<p class=\"has-white-color has-black-background-color has-text-color has-background\"><br><strong>Makello Helps You Save Even More, With Energy Storage Solutions<\/strong><\/p>\n\n\n\n<p>Makello will help you:   <br>1 &#8211; Qualify for rebates, incentives and discount utility rates.<br>2 &#8211; Suggest Energy Efficiency measures, to right-size of the solar and battery system.<br>3 &#8211; Determine if an existing electric panel can qualify for solar and battery.<br>4 &#8211; Provide an Ethical Energy Savings Report.<br>5 &#8211; Provide a purchase and installation contract for a solar and battery system to meet your goals and the site conditions.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"500\" src=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/energy-storage-LG-CHEM-power-wall-mount-TEXT-300-dpi.jpg\" alt=\"\" class=\"wp-image-2550\" style=\"width:529px;height:330px\" srcset=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/energy-storage-LG-CHEM-power-wall-mount-TEXT-300-dpi.jpg 800w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/energy-storage-LG-CHEM-power-wall-mount-TEXT-300-dpi-300x188.jpg 300w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/energy-storage-LG-CHEM-power-wall-mount-TEXT-300-dpi-768x480.jpg 768w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><figcaption class=\"wp-element-caption\"><em>LG Chem&#8217;s DC Coupled solutions are eligible for SGIP Rebates.<\/em> LG Chem is one of the world&#8217;s top battery suppliers since 2016, with RESU Lithium-Ion batteries. <\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<p><em>Makello offers NeoVolta, Enphase and LG Chem <\/em>Advanced Energy Storage for residential solar and battery installations in our SDG&amp;E territory for 2021 Reservations.  (We are experienced with Outback and Sonnen battery systems as well.)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"663\" src=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Makello_Territory_by_Zipcode-1024x663.jpg\" alt=\"\" class=\"wp-image-2480\" srcset=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Makello_Territory_by_Zipcode-1024x663.jpg 1024w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Makello_Territory_by_Zipcode-300x194.jpg 300w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Makello_Territory_by_Zipcode-768x497.jpg 768w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Makello_Territory_by_Zipcode-1536x994.jpg 1536w, https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Makello_Territory_by_Zipcode-2048x1325.jpg 2048w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/figure>\n<\/div><\/div>\n\n\n\n<p>Reference:<\/p>\n\n\n\n<p><strong><em>Green Energy EPC and State of California Required Documents:<\/em><\/strong><\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-4db1f100-2770-43f3-8416-ad1f68a7e8aa\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-NeoVolta-NV14-AC-Coupled-LiFePO4-Energy-Storage.pdf\">Green-Energy-EPC-contract-for-NeoVolta-NV14-AC-Coupled-LiFePO4-Energy-Storage<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-NeoVolta-NV14-AC-Coupled-LiFePO4-Energy-Storage.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-4db1f100-2770-43f3-8416-ad1f68a7e8aa\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-a3ef33a1-2cfa-4b62-bf79-4694648faff3\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-NeoVolta-NV24-AC-Coupled-LiFePO4-Energy-Storage.pdf\">Green-Energy-EPC-contract-for-NeoVolta-NV24-AC-Coupled-LiFePO4-Energy-Storage<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-NeoVolta-NV24-AC-Coupled-LiFePO4-Energy-Storage.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-a3ef33a1-2cfa-4b62-bf79-4694648faff3\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-eed35125-ae52-4c78-9be3-6753edeaf271\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-10.5kWh-3.84kW-Enphase-1-x-Encharge-10-1P-NA-AC-Coupled-LiFePO4-Energy-Storage.pdf\">Green-Energy-EPC-contract-for-10.5kWh-3.84kW-Enphase-1-x-Encharge-10-1P-NA-AC-Coupled-LiFePO4-Energy-Storage<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-10.5kWh-3.84kW-Enphase-1-x-Encharge-10-1P-NA-AC-Coupled-LiFePO4-Energy-Storage.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-eed35125-ae52-4c78-9be3-6753edeaf271\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-f7a981a7-a424-474c-bad5-455f85486423\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Addendum-to-the-Green-Energy-EPC-contract.pdf\">Addendum to the Green Energy EPC contract<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Addendum-to-the-Green-Energy-EPC-contract.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-f7a981a7-a424-474c-bad5-455f85486423\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-ccffe2d9-95da-46de-873f-02dfcafc85b3\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Solar_Consumer_Protection_Guide_2021_Green-Energy-EPC.pdf\">Solar_Consumer_Protection_Guide_2021_Green-Energy-EPC<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Solar_Consumer_Protection_Guide_2021_Green-Energy-EPC.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-ccffe2d9-95da-46de-873f-02dfcafc85b3\">Download<\/a><\/div>\n\n\n\n<p><strong><em>NeoVolta Documents:<\/em><\/strong> (For a new or existing solar panel system, with or without a solar inverter)<\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-8a9ecb02-b870-4f42-a219-63e6d936c68d\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-Sales-Packet-Aug-2020.pdf\">NeoVolta-Sales-Packet Aug 2020<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-Sales-Packet-Aug-2020.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-8a9ecb02-b870-4f42-a219-63e6d936c68d\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-49507113-aa13-469f-9154-cd8aa80511a9\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-NV14-NV24-Specifications-Sheet-15-July-2021.pdf\">NeoVolta-NV14-NV24-Specifications-Sheet-15-July-2021<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-NV14-NV24-Specifications-Sheet-15-July-2021.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-49507113-aa13-469f-9154-cd8aa80511a9\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-3f43efa7-e220-4c5f-94bc-a99d39f51cd9\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-NV14-and-NV24-Warranty-12-October-2020.pdf\">NeoVolta-NV14-and-NV24-Warranty-12-October-2020<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-NV14-and-NV24-Warranty-12-October-2020.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-3f43efa7-e220-4c5f-94bc-a99d39f51cd9\">Download<\/a><\/div>\n\n\n\n<p><strong><em>Enphase Documents:<\/em><\/strong>  (For an existing Enphase microinverter solar panel system; M215, M250, S280, IQ7X, IQ8X).  Note: S280 must be replaced with IQ8X inverters at extra cost $250\/solar module installed. Note: M215 and M250 existing Enphase microinverters adds $900 to Gross Cost.<\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-76e4e629-6bb3-464b-8d35-8275b01bb475\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Enphase-Encharge-10-DS-EN-US.pdf\">Enphase-Encharge-10-DS-EN-US<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Enphase-Encharge-10-DS-EN-US.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-76e4e629-6bb3-464b-8d35-8275b01bb475\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-58b53af1-58bf-4891-baee-f90e1d5cfcc6\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Encharge-Warranty.pdf\">Encharge-Warranty<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Encharge-Warranty.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-58b53af1-58bf-4891-baee-f90e1d5cfcc6\">Download<\/a><\/div>\n\n\n\n<p><strong><em>LG Chem Documents:<\/em><\/strong>  (For an existing solar panel system using SolarEdge battery ready inverter; SE3800A-USS2, SE7600A-USS2, SE3800H-USS3, SE7600H-USS3)<\/p>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-d058b839-186b-44d2-8ef3-d9faa70a0384\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/RESU_Prime_Leaflet_1127_EN_US_13078_20201208061356015.pdf\">RESU_Prime_Leaflet_1127_EN_US_13078_20201208061356015<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/RESU_Prime_Leaflet_1127_EN_US_13078_20201208061356015.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-d058b839-186b-44d2-8ef3-d9faa70a0384\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-ce16df07-3bc5-4596-8169-065e5d5fbd73\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/LG-RESU10H-Prime-Data-Sheet-Ver-1.3.pdf\">LG-RESU10H-Prime-Data-Sheet-Ver-1.3<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/LG-RESU10H-Prime-Data-Sheet-Ver-1.3.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-ce16df07-3bc5-4596-8169-065e5d5fbd73\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-af7d6fe5-edba-4217-8907-f1c0da25d09a\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/LG-RESU16H-Prime-Data-Sheet-Rev2.pdf\">LG-RESU16H-Prime-Data-Sheet-Rev2<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/LG-RESU16H-Prime-Data-Sheet-Rev2.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-af7d6fe5-edba-4217-8907-f1c0da25d09a\">Download<\/a><\/div>\n\n\n\n<div class=\"wp-block-file\"><a id=\"wp-block-file--media-00d8659b-76e7-46b2-999d-1a4b03c63c05\" href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/210427_RESU-Prime-Warranty_v5.4_EU-Standard_Clean_Final.pdf\">210427_RESU-Prime-Warranty_v5.4_EU-Standard_Clean_Final<\/a><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/210427_RESU-Prime-Warranty_v5.4_EU-Standard_Clean_Final.pdf\" class=\"wp-block-file__button wp-element-button\" download aria-describedby=\"wp-block-file--media-00d8659b-76e7-46b2-999d-1a4b03c63c05\">Download<\/a><\/div>\n<!-- WP Attachments -->\r\n        <div style=\"width:100%;margin:10px 0 10px 0;\">\r\n            <h3>Attachments<\/h3>\r\n        <ul class=\"post-attachments\"><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-NeoVolta-NV14-AC-Coupled-LiFePO4-Energy-Storage.pdf\">Green Energy EPC contract for NeoVolta NV14-AC Coupled LiFePO4 Energy Storage<\/a> <small>(2 MB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Addendum-to-the-Green-Energy-EPC-contract.pdf\">Addendum to the Green Energy EPC contract<\/a> <small>(51 kB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Solar_Consumer_Protection_Guide_2021_Green-Energy-EPC.pdf\">Solar_Consumer_Protection_Guide_2021_Green-Energy-EPC<\/a> <small>(5 MB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-Sales-Packet-Aug-2020.pdf\">NeoVolta-Sales-Packet Aug 2020<\/a> <small>(2 MB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-NV14-NV24-Specifications-Sheet-15-July-2021.pdf\">NeoVolta-NV14-NV24-Specifications-Sheet-15-July-2021<\/a> <small>(2 MB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/NeoVolta-NV14-and-NV24-Warranty-12-October-2020.pdf\">NeoVolta-NV14-and-NV24-Warranty-12-October-2020<\/a> <small>(174 kB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Enphase-Encharge-10-DS-EN-US.pdf\">Enphase-Encharge-10-DS-EN-US<\/a> <small>(147 kB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/RESU_Prime_Leaflet_1127_EN_US_13078_20201208061356015.pdf\">RESU_Prime_Leaflet_1127_EN_US_13078_20201208061356015<\/a> <small>(4 MB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/210427_RESU-Prime-Warranty_v5.4_EU-Standard_Clean_Final.pdf\">210427_RESU-Prime-Warranty_v5.4_EU-Standard_Clean_Final<\/a> <small>(911 kB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Encharge-Warranty.pdf\">Encharge-Warranty<\/a> <small>(304 kB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/LG-RESU10H-Prime-Data-Sheet-Ver-1.3.pdf\">LG-RESU10H-Prime-Data-Sheet-Ver-1.3<\/a> <small>(331 kB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-NeoVolta-NV24-AC-Coupled-LiFePO4-Energy-Storage.pdf\">Green-Energy-EPC-contract-for-NeoVolta-NV24-AC-Coupled-LiFePO4-Energy-Storage<\/a> <small>(2 MB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/LG-RESU16H-Prime-Data-Sheet-Rev2.pdf\">LG-RESU16H-Prime-Data-Sheet-Rev2<\/a> <small>(233 kB)<\/small><\/li><li class=\"post-attachment mime-application-pdf\"><a href=\"https:\/\/makello.com\/blog\/wp-content\/uploads\/2021\/09\/Green-Energy-EPC-contract-for-10.5kWh-3.84kW-Enphase-1-x-Encharge-10-1P-NA-AC-Coupled-LiFePO4-Energy-Storage.pdf\">Green-Energy-EPC-contract-for-10.5kWh-3.84kW-Enphase-1-x-Encharge-10-1P-NA-AC-Coupled-LiFePO4-Energy-Storage<\/a> <small>(2 MB)<\/small><\/li><\/ul><\/div>","protected":false},"excerpt":{"rendered":"<p>New Self-Generation Incentive Program (SGIP) Rebate application for Step 7 &#8211; Small Residential Energy Storage funding, becomes available starting Monday, Sept 27, 2021, at a rebate value of $0.15\/wH. Caller: &#8220;Quick question. I already have solar, so which Battery is right for me? I need an answer ASAP, because SGIP Rebates are back and who &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/makello.com\/blog\/step-7-small-residential-energy-storage-rebate-is-open\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Step 7 &#8211; Small Residential Energy Storage Rebate Is Open!&#8221;<\/span><\/a><\/p>\n","protected":false},"author":9,"featured_media":2459,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[306,9,8,139],"tags":[260,392,74,167,201,426],"class_list":["post-2448","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-storage","category-optimal-cost-savings","category-plug-in-vehicles","category-solar","tag-battery","tag-emergency-backup-power","tag-energy-analysis","tag-energy-storage","tag-residential","tag-sgip-rebate"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/posts\/2448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/comments?post=2448"}],"version-history":[{"count":57,"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/posts\/2448\/revisions"}],"predecessor-version":[{"id":3715,"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/posts\/2448\/revisions\/3715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/media\/2459"}],"wp:attachment":[{"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/media?parent=2448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/categories?post=2448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/makello.com\/blog\/wp-json\/wp\/v2\/tags?post=2448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}